Concrete over-ordering, short loads, and disposal/recycling procedures
Every groundworker, project manager, and self-builder has experienced that distinct pang of anxiety as the discharge chute of a ready-mix truck scrapes dry, leaving three linear metres of foundation trench or an unfulfilled corner of a slab staring back at them. The opposite scenario is scarcely better: watching a mixer spin with two cubic metres … Read more